Kitchen Fitter · Quote template

Free kitchen fitter quote template

A kitchen fit is a coordination job: units, worktops, appliances, plumbing, electrics and sometimes gas, all in one room and on one quote. This kitchen fitter quote template separates what you fit from what other trades certify, prices worktop templating on its own, and shows what is in and out of scope.

Things to know

Decide upfront whether appliances are customer-supplied or ones you're sourcing, and mark it clearly on the quote. A customer who buys their own oven and finds it doesn't fit the cut-out you built the units around will blame the fitter, not the appliance choice. Note exact appliance dimensions and model numbers on the quote to protect yourself before the units are even ordered.

Worktop templating deserves its own line, priced separately from carcass fitting. It typically happens after units are installed and before the worktop is cut, which means a second site visit with its own travel time. Folding it silently into a flat "kitchen fitting" price makes it invisible and easy to underprice when a job runs to two visits instead of one.

A kitchen fit rarely stays inside one trade. Plumbing for the sink and dishwasher, and an electrician for new sockets and under-unit lighting, both need to happen at specific points: first fix before units go in, second fix after. State clearly which trades you're coordinating directly and which the customer needs to arrange themselves, so nobody discovers a missing electrician mid-installation.

Removing and disposing of the old kitchen is real, billable labour and van space, not a courtesy. Skip hire or tip runs cost money and time either way. Price it as its own line so a customer comparing your quote against one that quietly excludes disposal is comparing like for like, instead of assuming yours is more expensive for the same job.

Typical kitchen fitter line items and UK prices

Indicative ranges, excluding VAT. Rates vary by region (London and the South East run higher) and by job size.

ItemUnitTypical range
Fit base + wall unitsper unit£50–£90
Fit laminate worktop (incl. joints + cut-outs)per metre£40–£80
Quartz/granite worktop templating + fittingStone itself priced by the supplier.per kitchen£300–£700
Strip out existing kitchen + disposalper kitchen£300–£600
Integrated appliance fittingper appliance£40–£80
Plumbing first + second fix (sink, dishwasher, washer)per kitchen£300–£600
Cooker hood + ducting to outsideper job£150–£350
Kitchen fit, average 10–12 units (labour only)per kitchen£2,000–£4,500

Common kitchen fitter jobs and how to price them

Fit-only kitchens
Customer buys the kitchen; you quote per unit plus worktops, appliances and plumbing, with a site survey first.
Supply-and-fit kitchens
Fixed price with a supplier quote attached and a deposit taken before ordering.
Worktop replacements
Per metre plus templating for stone, and making good to tiles or upstands.
Appliance swaps
Per appliance, including adjusting cabinets for integrated units.

Regulations and certificates to reference

  • Gas Safe Register — connecting a gas hob or range cooker must be done by a Gas Safe registered engineer. If that is not you, list the connection as excluded or as a subcontracted line.
  • Building Regulations Part P — a new cooker circuit or a new circuit for an island is notifiable electrical work. Like-for-like socket moves on existing circuits usually are not.
  • Building Regulations Part F (ventilation) — a kitchen needs mechanical extraction — about 30 litres per second with a hood over the hob, or 60 l/s for a wall fan elsewhere. Quote the extractor and ducting.

Payment terms kitchen fitters commonly use

  • Supply-and-fit: 30–50% deposit to order units, a stage payment on delivery, balance on completion.
  • Fit-only: deposit to book the slot, balance on completion.
  • Stone worktops: paid in full to the supplier before templating — state that clearly.

Read more: Invoice payment terms explained · Payment methods to offer clients

VAT and CIS for kitchen fitters

VAT

Kitchen supply and fitting is standard-rated at 20% once registered. If the customer buys the units directly, you only charge VAT on your labour.

Construction Industry Scheme (CIS)

Fitting kitchens on a building project is a construction operation. If you subcontract to a builder, CIS applies to your labour; if you sell and fit direct to homeowners, it does not.

General guidance, not tax advice — check your position with HMRC or an accountant.

Read more: Do I need to charge VAT on my invoices? · What must an invoice include? (UK legal requirements)

What this template includes

  • Units and carcasses priced separately from fitting labour
  • Worktop templating and installation as its own line
  • Appliance connection and other-trade coordination noted
  • Old kitchen removal and disposal
  • PDF download or shareable tracked link

Full guide

How to Start a Kitchen Fitting Business as a Sole Trader

→

Frequently asked questions

Only if they are Gas Safe registered. Otherwise the quote should exclude the gas connection, or include it as a line done by a registered engineer.

Stone and quartz worktops are cut to a template taken after the base units are fitted. It is a separate visit and a separate stage. Listing it explains the gap between units going in and worktops arriving.

If the job needs a new circuit, such as for an induction hob or an island, it is notifiable under Part P. Include it as a line from a registered electrician, or exclude it clearly.

Attach the signed-off plan to the quote and state that changes after ordering are chargeable. Most fitting disputes come from a design nobody signed.

Either works, but state it explicitly and record model numbers and dimensions on the quote — a mismatch between an appliance and the cut-out built around it is the most common kitchen-fitting dispute.

Templating usually happens on a second visit after units are fitted, with its own travel time and labour. Pricing it separately reflects the real two-visit structure of most kitchen jobs.

Either you coordinate them directly or the customer arranges their own — state which on the quote so first-fix and second-fix timing doesn't get missed.

More free templates

All templates

Send your first quote today

Free plan stays free forever. No credit card. Branded PDFs in 60 seconds.

Start free